Own product
MyPetCerts
My own SaaS, live since 2016. Its Grails 6.2.3 / Java 17 rebuild is in final cutover prep, and I rehearsed the production cutover end to end: one pass, about 17 minutes, zero schema failures.
Live since 2016; Grails 6.2.3 v2 in final cutover prep